Final approach
Identify the approved towing route, entrances, turns, gate dimensions and surface conditions at the event site.
From a compact community switch-on to a festival centrepiece, the stage can be configured to suit a wide range of event formats and site sizes. Adjustable height, deck levels and optional PA and branding wings help create the right setting for your performers, audience and sponsors.
The final configuration is agreed around your site, access and event requirements. PA and branding options are quoted separately.
See the stage
These are photographs of the stage supplied by Heath Technologies in live event settings.
Stage hire calculator
Choose a stage size, add any stage extras and enter the delivery postcode to get a guide price for the stage, travel, setup and de-rig.
Site access and setup
Regional travel is only one part of the plan. The final route into the event, working space and collection window determine whether the trailer stage can be delivered and built as proposed.
Identify the approved towing route, entrances, turns, gate dimensions and surface conditions at the event site.
Coordinate the stage footprint and setup area with barriers, traders, production compounds and other suppliers in the build schedule.
Use realistic delivery and collection times so regional travel, setup and de-rig can be included in the guide price and final plan.
Delivery and planning
Ash checks towing access, ground conditions, event timings and separately requested technical support before confirming the arrival and collection plan.
Read the stage planning guide, view the full stage details, or explore event-specific guidance for festivals, seasonal outdoor stage hire, Christmas light switch-on stage hire and Bonfire Night stage hire.
West Midlands stage hire questions
Suitable regional sites can be supported where the towing route, working footprint, ground conditions and event timetable allow a safe and practical delivery.
The postcode is used for the initial mileage and travel-time estimate. Full access instructions are still needed because the postcode does not describe the final route into the site.
Technical engineering, site power planning and sourced equipment can be added to an agreed brief. These remain separate from the base trailer-stage scope.
Enter the proposed collection date and time in the calculator. The final booking confirms the access window after the show and the route back to the stage.